Job Name/Reference
Installation of a 11kV overhead line feeding TMF
Place of execution
DYNATEC MADAGASCAR plant site to TMF,
Toamasina – Madagascar
Client Name
DYNATEC MADAGASCAR S.A
Client adress
DYNATEC MADAGASCAR Amboakarivo site, BP.419 Amboakarivo, Toamasina- Madagascar
Management
Tantely R. (Project Manager)
Number of personnel worked in the project
75
Project duration
56 799 hours
Specialized man power
Surveyor, Line Assembler, Crane Operator
Installation of a 7km long 11kV electrical power transmission line to supply the TMF (Tailings Management Facility) from the Ambatovy thermal power plant.
Lost Time Injury (LTI) recorded : 00
August 2018
January 2019