Achievements

Terminal container substation maintenance and upgrade for MICTSL

Client informations

Job Name/Reference

MICTSL Terminal container substation maintenance and upgrade​

Place of execution

Toamasina Port terminal container, Toamasina – Madagascar​

Client Name

Madagascar International Container Terminal Services Limited (MICTSL)​

Client adress

MICTSL Toamasina Port – Madagascar​

Committed staff

Management

Tantely R. (Project Manager)

Number of personnel worked in the project​

12

Project duration

12.5 months

Specialized man power

Project details

Maintenance and power reinforcement for the medium-voltage transformer station, low voltage, and the main-low voltage switchboard (TGBT) of the container terminal.

Lost Time Injury (LTI) recorded : 00

Job description

Start date (month/year)

February 2014

End date (month/year)

June 2014

  • Drop off the old line including the isolator, clamp, vibration damper, guard wire.
  • Install new composite isolator with clamp.​
  • Pull new conductor.​
  • Fix conductor in the clamp and install new vibration damper.​
  • Commissioning.​