Achievements

Electrical grid grounding and ground fault protection for QMM

Client informations

Job Name/Reference

QMM Electrical grid grounding and ground fault protection of the overhead line​

Place of execution

Fort-Dauphin – Madagascar​

Client Name

QIT Madagascar Minerals (QMM)​

Client adress

QMM MADAGASCAR MINERALS, Fort-Dauphin 614 – Madagascar​

Committed staff

Management

Tantely R. (Project Manager)
Vonjy R. (Site Supervisor)

Number of personnel worked in the project​

33

Project duration

165 months

Specialized man power

Project details

Improvement of the ground fault protection of the overhead line distribution grid.

Lost Time Injury (LTI) recorded : 00

Job description

Start date (month/year)

February 2014

End date (month/year)

December 2014

  • Installation of Neutral earthing resistor (NER) for the two main power transformer.
  • Installation of neutral earthing resistor (NER) for two 6 MVA – 11kV diesel generator.
  • Installation of core balanced current transformer inside 14 switchgear cubicles.
  • Rewiring and programming of medium voltage relay protection.
  • Installation of a new earthing for all the 96 metallic pole of the overhead line to obtain less than 10 ohms of resistivity.
  • Commissioning.